Skip to content

Monday to Saturday, 10:00 am to 6:30 pm

Registration

Factory License Registration

Factories Act, 1948 Compliance

Mandatory for all manufacturing units employing 10+ workers (with power) or 20+ workers (without power). We handle Plan Approval and License Grant from the Directorate of Factories & Boilers.

5-Year
Validity Option
  • Written quote before any work
  • Secure payment through Razorpay
  • One office number

Get a written quote

About: Factory License Registration

+91

No charge for the call or the quote. We use these details only to answer your enquiry. See our privacy policy.

Non-compliance can lead to a fine of up to ₹2 Lakhs, factory shutdown, and imprisonment.

At a glance

What this service covers

Two-Stage Approval

  • 1. Plan Approval

    Before construction/occupancy, the factory building plan and layout must be approved by the Chief Inspector of Factories.

  • 2. License Grant

    After plan approval, the application (Form 2) is filed to get the license for manufacturing operations (valid 1-5 years).

  • Worker Safety

    The license ensures proper ventilation, sanitation, and safety fencing of machinery as per the Act's guidelines.

Options

Packages

We simplify the complex filing process for all factories.

  • Building Plan NOC

    Before Construction/Expansion

    Initial Stage

    • Form 1 Submission
    • Architect Plan Scrutiny
    • Stability Certificate Filing
    • Safety Report Drafting
  • License Grant

    After Plan Approval

    Form 2 Filing

    • Form 2 Application
    • NOC from Fire Dept
    • Pollution Dept Consent (PCC)
    • Inspection Management
  • Hazardous Unit

    Chemical / Explosives

    Special Case

    • Everything in License Grant
    • On-Site Emergency Plan
    • Health & Safety Policy
    • Explosive Dept NOC

The fee for your case comes in a written quote, with our professional fee, government fees and GST shown separately. Nothing starts until you accept it.

Documents

Documents we will ask for

Nothing to send now. After you accept the quote and pay, you upload these from your phone against this same list, and each one shows whether it is received, approved or needs to be sent again.

  • Approved Factory Layout Plan

    (Architect Signed)

  • Fire NOC

    (No Objection Certificate)

  • Pollution Dept Consent

    (Consent to Establish/Operate)

  • List of Machinery, Raw Materials & Finished Goods

  • ID Proof

    of Occupier & Manager

The work, stage by stage

Stages of the work

You see these same stages in your login once the work starts, and you are told when each one is done.

  1. 1

    Plan Submission (not started)

    Submit building plans to the Chief Inspector for approval.

  2. 2

    NOC Collection (not started)

    Obtain mandatory NOCs from Fire, Water & Pollution Control Boards.

  3. 3

    Form 2 Filing (not started)

    Submission of the formal license application (Form 2) online.

  4. 4

    License Grant (not started)

    Post-inspection, the license is granted, legally allowing operations.

Working with Parishrama

From enquiry to delivery, in the open.

The same five steps for every service. You always know what happens next.

  1. Step 1

    Enquire

    Tell us what you need. Your enquiry goes straight to our sales team and a sales expert calls you from the office number.

  2. Step 2

    Quote

    You get a written quote before anything else happens: our fee, government fees and GST shown separately.

  3. Step 3

    Pay securely

    Pay online through Razorpay by UPI, card or net banking. A receipt is issued straight away.

  4. Step 4

    Upload documents

    Upload from your phone against a simple checklist. We tell you if a document needs to be sent again, and why.

  5. Step 5

    Track to delivery

    The right operations team starts the work. Follow every stage in your login and chat with the people handling it.

Questions

Frequently asked

Something else on your mind? Call the office - it is always the same number.

When is a Factory License mandatory?

It is mandatory if your premises employs 10 or more workers with power, OR 20 or more workers without power, for any manufacturing process.

Who is the 'Occupier' under the Act?

The 'Occupier' is the person who has ultimate control over the affairs of the factory (usually the Managing Director, Partner, or Proprietor). They hold the legal responsibility for compliance.

How is the license fee calculated?

The license fee is calculated based on two main factors: The number of workers employed and The total installed Horsepower (HP) of the machinery. Fees vary significantly by state.

Next step

Ready to start Factory License Registration?

Tell us what you need. A sales expert calls you from the office number and sends a written quote.