Skip to content

Monday to Saturday, 10:00 am to 6:30 pm

Registration

Fire License Registration

Fire NOC

Mandatory No Objection Certificate (NOC) from the Fire Department. Essential for construction completion, occupancy, and business operations in high-risk zones.

  • Written quote before any work
  • Secure payment through Razorpay
  • One office number

Get a written quote

About: Fire License Registration

+91

No charge for the call or the quote. We use these details only to answer your enquiry. See our privacy policy.

Operating without a Fire NOC may invalidate your insurance policy in case of fire damage.

At a glance

What this service covers

  • Occupancy Permit

    It is a prerequisite for obtaining the Completion Certificate and Occupancy Certificate (OC) from the Municipal Corporation.

  • Business License

    Mandatory for getting other commercial licenses, including Trade License and Factory License, in many states.

  • Public Safety

    Ensures the building meets all safety standards for evacuation and fire suppression, protecting lives and assets.

Options

Packages

We guide you through the process for various stages.

  • Provisional NOC

    For Building Sanction

    Construction Stage

    • Scrutiny of Architectural Plans
    • Layout Compliance Check
    • Application Filing
    • Fire Dept. Fee Payment
  • Final Fire NOC

    Recommended

    For Business Operation

    Occupancy Stage

    • On-site Inspection Prep
    • Final System Testing
    • Liaison with Chief Fire Officer
    • Final NOC Issuance
  • NOC Renewal

    Annual / Biannual Renewal

    Compliance

    • System Audit & Report
    • Renewal Filing
    • Fire Safety Logbook Check
    • Dedicated Manager

The fee for your case comes in a written quote, with our professional fee, government fees and GST shown separately. Nothing starts until you accept it.

Documents

Documents we will ask for

Nothing to send now. After you accept the quote and pay, you upload these from your phone against this same list, and each one shows whether it is received, approved or needs to be sent again.

  • Architectural Plans

    (Building Layout & Section)

  • Fire Fighting System Details

    (Pumps, Sprinklers)

  • Completion Certificate

    (Building Structure)

  • Test Reports

    of Fire Safety Equipment

  • Previous Provisional NOC

    Copy

The work, stage by stage

Stages of the work

You see these same stages in your login once the work starts, and you are told when each one is done.

  1. 1

    Compliance Check (not started)

    We review your site/plans against National Building Code (NBC) standards.

  2. 2

    Filing (not started)

    Application is submitted online to the respective State Fire Department.

  3. 3

    Physical Audit (not started)

    The Fire Officer conducts a mandatory site inspection of all systems.

  4. 4

    NOC Issued (not started)

    The Final Fire NOC is issued, allowing legal occupancy.

Working with Parishrama

From enquiry to delivery, in the open.

The same five steps for every service. You always know what happens next.

  1. Step 1

    Enquire

    Tell us what you need. Your enquiry goes straight to our sales team and a sales expert calls you from the office number.

  2. Step 2

    Quote

    You get a written quote before anything else happens: our fee, government fees and GST shown separately.

  3. Step 3

    Pay securely

    Pay online through Razorpay by UPI, card or net banking. A receipt is issued straight away.

  4. Step 4

    Upload documents

    Upload from your phone against a simple checklist. We tell you if a document needs to be sent again, and why.

  5. Step 5

    Track to delivery

    The right operations team starts the work. Follow every stage in your login and chat with the people handling it.

Questions

Frequently asked

Something else on your mind? Call the office - it is always the same number.

Is Fire NOC mandatory for my building?

Yes, if your building is a high-rise (above 15 meters/5 stories), or is used for public assembly (Hospital, School, Mall, Theatre, Factory).

How long is a Fire NOC valid?

Provisional NOC (for construction) is valid for 1-2 years. Final NOC (for operation) is generally valid for 1-3 years and must be renewed regularly based on state rules.

What happens during the physical inspection?

The Fire Officer will check the functionality of your fire suppression systems (sprinklers, hydrants, alarms), the width of exit staircases, and the adequacy of fire extinguishers.

Next step

Ready to start Fire License Registration?

Tell us what you need. A sales expert calls you from the office number and sends a written quote.